Go top
Project information

Design of the planning and control traffic system of Metro de Málaga

A. Fernández-Cardador A.P. Cucala

May 2011 - July 2012

Funding entity Indra Sistemas

Participated by Metro de Málaga


In this project centralised planning and control systems are designed for the Metro de Málaga Control Center. The systems are parametrised and the performance is evaluated.


METROMLG